TJS-7 Series cold heading machine
Main technical parameters:
MODEL |
|
TJS-8B-80 |
TJS-10BS |
TJS-10BL |
TJS-11B |
TJS-14B |
Stons Qunty |
No. |
6 |
6 |
6 |
6 |
6 |
Forming Force |
Kgs |
15000 |
23000 |
23000 |
50000 |
80000 |
Max. Cut- -off Diameter |
mm |
Φ6 |
Φ8 |
Φ8 |
Φ9 |
Φ12 |
Max. Cut- -off L ength |
mm |
25 |
40 |
50 |
40 |
60 |
Producton Spedpcs |
Pcs/min |
60-210 |
60-210 |
60-210 |
30-160 |
50-160 |
P.KO Stroke |
mm |
|
|
|
13 |
15 |
KO Stroke |
mm |
30 |
50 |
80 |
40 |
45 |
Stroke |
mm |
80 |
80 |
110 |
100 |
140 |
Cut off Die Diameter |
mm |
Φ28*50L |
Φ19*40L |
Φ19*40L |
Φ25*50L |
Φ35*60L |
Punch Diameter |
mm |
Φ20*70L |
Φ31*80L |
Φ31*80L |
Φ35*95L |
Φ40*130L |
Main Die Diameter |
mm |
Φ35*80L |
Φ46*100L |
Φ46*100L |
Φ46*100L |
Φ56*120L |
Die Pitch |
mm |
38 |
53 |
53 |
53 |
60 |
Normal Sina of Bolt |
mm |
Φ2-Φ7 |
Φ3-Φ8 |
Φ3-Φ8 |
12MM |
14MM |
Shank Length of Blank |
mm |
2-20 |
30 |
45 |
5-25;8-35 |
5-35;10-50 |
Main Motor Power |
KW |
7.5KW-8 |
11KW-8 |
11KW-8 |
22KW-8 |
45KW-8 |
Main Motor voltage |
V |
380V |
380V |
380V |
380V |
380V |
Main Motor frequency |
HZ |
75HZ |
75HZ |
75HZ |
75HZ |
75HZ |
Main Motor speed |
r/min |
750 |
750 |
750 |
750 |
750 |
Pump power |
W |
2*180W(1/4HP) |
2*180W(1/4HP) |
2*180W(1/4HP) |
2*735W(1HP) |
2*735W(1HP) |
Oil consumption |
L |
100L |
100L |
100L |
|
200L |
Volume(L*W*H) |
M |
2.6*1.3*1.6 |
2.6*1.3*1.65 |
2.6*1.3*1.65 |
3.1*1.5*1.97 |
3.8*1.7*2.4 |
Weight |
Ton |
3.5 |
3.6 |
3.6 |
5.5T |
9 |
The operation method of nut machine is as follows:
1. Preparation: Install the screwdriver bit or core puller, and ensure that the power supply is plugged in and grounded.
2. Adjust the torque: Adjust the torque of the machine as needed, usually through a knob or button.
3. Start the operation: Insert the screw into the nut, align the screw head with the nut hole, start the machine, and start tightening the nut.
4. Adjust the angle: Adjust the nut tightening angle of the machine as needed, usually through a knob or button. After tightening one nut, you can adjust the angle appropriately before unscrewing the next one.
5. Complete the operation: When all nuts are tightened, turn off the power of the machine, clean the work area, remove the screwdriver head or core puller, and store the whole machine.
6. Maintenance: Clean the tools in time after use and keep the outside of the machine dry and clean. Regularly check whether the machine is in good condition. If it is damaged, it should be repaired or replaced in time.
description2